Projects

20 storey reclad. Engineered scaffold and access, strategic removal of 2 decade old stone dash cementitious stucco, in some places 2.5" thick. Remove all the drywall, install new windows, new densglass drywall, and EIFS system. All deck surfaces were profiled and covered with BASF sonoguard traffic coating. Improper fastening system for such a heavy cladding, no through wall flashings, window details incorrect.

waters edge03

Workers doing demolition work on the South side. Stone dash stucco, 20 storeys high. Replaced the drywall and did new EIFS install.

waters edge04

waters edge05

waters edge06

Engineered scaffold solutions, hydro lifts. Very difficult access scenario.